Toledo Subdivision Track Diagrams

These drawings are B&O Signal Engineering track diagrams showing track arrangements and the CPL signal arrangements at these locations.  CTC was installed on the Third District of the B&O's Toledo Subdivision in 1931 and became one of the earliest installations of this type.  My thanks to John Mohre and the Garrett Railroad Museum.
 

Roachton to MP 187.6 Belmore
Hull Prairie and Haskins North Leipsic
Haskins to MP 182.9 Leipsic Junction
North Tontogany South Leipsic
South Tontogany MP 153.6 to NAS Ottawa Lap Siding
Weston NAS Ottawa
South Weston to MP 172.7 Ottawa Lap Siding
Milton and Custer MP 146.4 to MP 143.8
South Custer to MP 168.6 Columbus Grove
MP 167.5 to NAS Deshler Columbus Grove Siding to MP 139.6
Deshler Diamonds MP 139.7 to Cairo Lap
Deshler Yard Area, NAS Sidings Deshler Cairo Lap to South Cairo and MP 134.5
SAS South Deshler North Lima Yard

Back to Technical Index

Back to CPL Home

Updated: January 21, 2007